进排水阀测试
认证网 (2017/9/29 12:23:37) 浏览:778 评论:0
Test item 测试名称: inlet valve & outlet valve test 进排水阀测试
Test info 测试内容:
Clause Test Requirement
inlet valve test EN 14124 Inlet valves for flushing cisterns with internal overflow
进水阀测试 EN 14124 带有内部溢流冲洗水箱的进水阀
outlet valve test PREN 14055 WC And Urinal Flushing Cistern (outlet valve only)
排水阀测试 EN 14055 座便器以及小便器的冲洗水箱 (仅做排水阀部分)
Sampling requirement: 5 sets of completed samples with assembly instruction (if applicable)
样品要求:全套样品5套,并伴随安装说明书(如果适用)
Turnaround time: normal (45 days)
所需时间:标准(45天)
Test info 测试内容:
Clause Test Requirement
inlet valve test EN 14124 Inlet valves for flushing cisterns with internal overflow
进水阀测试 EN 14124 带有内部溢流冲洗水箱的进水阀
outlet valve test PREN 14055 WC And Urinal Flushing Cistern (outlet valve only)
排水阀测试 EN 14055 座便器以及小便器的冲洗水箱 (仅做排水阀部分)
Sampling requirement: 5 sets of completed samples with assembly instruction (if applicable)
样品要求:全套样品5套,并伴随安装说明书(如果适用)
Turnaround time: normal (45 days)
所需时间:标准(45天)